During this current week, the NESB team revisited the River Don at Doncaster to de-mob silt screens, oil boom and bubble curtains for our client, which we previously installed. We install the bubble curtains by using a unique and an effective way.
As NESB have installed and de-mobbed multiples of this type equipment in various locations throughout our time an we have become leaders in this.
Our team utilized a sturdy, lightweight and easily controllable Fun-yak boat to carry out the project with ease. Luckily, the weather conditions were favorable for the crew.